Below is an overview of Tallinn’s scenic areas by district. The descriptions of each scenic area include a map of the area showing the borders of the...
Caused by a major water leakage on the corner of Mere puiestee and Ahtri street, the traffic of tram line No. 1 is currently stopped and the tram line No. 2 is temporarily running on a free schedule on the route Vana-Lõuna – Suur Paala. A replacement bus line is running between Kopli and Hobujaama tram stops.
Due to the construction works on Vana-Kalamaja Street at the crossroads of Tööstuse and Soo streets, there is a temporary change in the route of bus line 3 on the way out of the city, i.e. in the direction of Randla from 8 May to 21 May.
Due to Vanasadama tramway construction, the northern section of Ahtri Street between Paadi and Laeva streets will be closed to traffic from 10:00 on Tuesday, 9 May. The traffic changes will affect the routes of bus lines 20, 20A, 34 and 66.
Tallinn City has successfully reached the end of talks with all landowners in the area for constructing a tram and pedestrian pathway connecting Vanasadama and the Rail Baltic to the Ülemiste Travel Terminal and ensuring its openness to the public.
Kursi Street and Põhja pst. intersections will be closed to traffic from 24 July to 30 September due to construction works on the Vanasadama tramway. The locations of the bus stops for bus lines 3, 66 and 73 will be relocated for the duration of the construction.
Due to construction work on the Vana-Kalamaja and Soo tänav intersection, it will be closed to traffic from 7 to 13 August. Due to the construction work, the route for bus line 3 will be changed in the Randla direction and the bus will be rerouted.
Next week, from 21-27 August, people residing in Tallinn according to the population register can drop off bulky waste, such as unusable furniture, bicycles and baby prams, at the city's waste transfer stations for free.
The reconstruction works on Vana-Kalamaja Street in Põhja-Tallinn are approaching completion. The project resulted in a high-quality urban space that ensures safe and comfortable travel for people, with a focus on promoting walking and cycling. The renovated street will be opened during a street festival, which takes place from 1-3 September. The regular route of bus line number 3 will resume on 1 September and the street will reopen to car traffic on the evening of 3 September.