In June, July and August, the Tallinn cycle paramedics team is once again patrolling in the Tallinn Old Town and City Centre. The cycle paramedics are able to respond quickly and operatively to medical emergencies in crowded areas.
On Thursday in Männi park, Tallinn Deputy Mayor Vladimir Svet and Deputy Head of Tallinn Urban Environment and Public Works Department Tarmo Sulg presented the concept for planning and constructing the public toilets in urban space, and stressed that the city's priority is to gradually increase the share of permanent toilets.
The Patkuli stairway, connecting the Lower Town of Tallinn with the northern side of the Toompea stronghold, will be closed from Monday 6 June until 27 June due to the restoration works of the Toompea’s lower retaining wall.
Tallinn Old Town Days, celebrating its fortieth anniversary, will take place on 3-5 June this year. The varied programme offers a total of 400 events taking place over three days in different parts of the Old Town.
During the two-day Old Town City Forum experts on urban planning, entrepreneurs, community members and city leaders are looking for practical ways to lead Tallinn's Old Town towards becoming a better living environment and a more attractive place for spending time.
In the draft 2023 city budget, the largest share of the total investment is in the reconstruction and overhaul of roads and streets, with €78.1 million planned. Emphasis is placed on the reconstruction of major transport nodes and the overhaul and rehabilitation of streets, bridges and viaducts.
Tallinn City Government and the Tallinn Urban Planning Department have put out for public consultation four preliminary plans for the Old Harbour area, which are open for comments until 12 January. There will also be an outdoor public exhibition next to the Admiralty Bridge, showing the nature of the plans and the proposed buildings.
At noon on Christmas Eve, Tallinn Mayor Mihhail Kõlvart proclaimed a Christmas peace, traditionally reading a historic Christmas greeting from the Town Hall window.
In November of this year, restoration work was completed between the Patkuli viewing platform and the Kitseaia park. The restoration work was carried out in two sections, with a total of 200 meters of retaining wall repaired.