The reconstruction of Varraku Street, which began in April 2024, is now complete, transforming the street into a safer and more pedestrian-friendly space.
The reconstruction of the section between Ehte Street and Kolde puiestee in Põhja-Tallinn has been completed. New, wide sidewalks and improved street lighting were built around Ehte School to enhance safety for students and local residents.
Tallinn is set to upgrade Apteegi, Kooli, and Gümnaasiumi streets in the Old Town. The renovation will include the reconstruction of district heating pipelines in collaboration with Utilitas, as well as upgrades to water supply and sewerage systems in cooperation with Tallinna Vesi.
The City of Tallinn is developing a modern urban space on Mustjõe and Värvi streets, including new safe pedestrian and cycling paths, traffic-calming measures, greenery, and a recreational area.
Odra Street will be closed to traffic from March 5 to June 15, 2025, due to construction work. Access for local residents, pedestrians, and cyclists will be maintained throughout the construction period. During this time, access to the Tallinn Bus Station will also be temporarily modified.
The City of Tallinn will build pedestrian and cycling paths on Gonsiori Street between Vesivärava and Laagna tee, while Tallinna Vesi will reconstruct the stormwater collector and drainage system near the intersection.
From March 5 to June 15, construction work will take place on Odra Street, temporarily closing the street to traffic. Bus lines no. 54 and 67 will be rerouted. Access will be maintained for local residents, pedestrians, and cyclists.
Due to the next stage in pipeline construction works and the reconstruction of the Sõpruse puiestee and Tihase tänav intersection, Sõpruse puiestee will be partially closed to traffic within the construction zones from 22-28 August.